What Are the 7 Stages of Construction?

Adeel Virk

Published by Adeel Virk

🔗 LinkedIn

Adeel is a founder & project manager at Virk Construction Management, delivering ethical, high-quality residential and commercial projects in NSW and Canberra.

Right, so you're thinking about building something. Could be a house, could be an office, could be that granny flat you've been talking about for three years. And someone mentions construction stages, and you're nodding along like you totally get it. But honestly? Most people don't. I didn't either when I started, and I'm supposed to know this stuff. So let's actually walk through what happens when you decide to build something, without making it sound like a textbook nobody wants to read.

Stage 1: Pre-Design (The Bit Where You Figure Out What You Actually Want)

This part's messier than anyone admits. You've got ideas. Maybe you've been screenshotting things on Instagram for six months. Maybe you drew something on the back of an envelope. Maybe you just know your current space doesn't work, but can't quite explain why. That's where this starts.

Pre-design is basically sitting down and getting real about what's possible. Not just what looks good in photos, but what actually makes sense for how you live or work. Because here's the thing... what you think you want and what you actually need? Sometimes those are two completely different things.

You'll look at your site. You'll talk about money, which is awkward but necessary. You'll discuss timelines. And yeah, you'll probably change your mind. Multiple times. That's normal. Better to flip-flop now than when there's actual walls you'd have to knock down.

Why Everyone Tries to Skip This (Don't)

I get why people want to rush through. You want to see something happening. Meetings about possibilities feel like you're just spinning your wheels. But here's what happens when you skip it... You end up making expensive decisions on the fly later. And "expensive" in construction means really expensive. Like, wow, I could've bought an expensive car.

Stage 2: Design Development

Okay, now things start looking real.

This is when architects and designers stop nodding at your ideas and actually draw them. You'll get floor plans that make sense. Elevations that show what it'll look like from the street. All those technical drawings are impressive, but also kind of confusing if you're not used to reading them.

You're making decisions now. Lots of them. Window sizes. Flooring types. Where the power points go, which sounds boring until you realise you're going to live with these choices for decades. Some days it feels overwhelming. Like, do I really need to have an opinion about door handles right now?

Yes. Apparently, you do.

But this is also when your Pinterest board starts turning into something that could actually exist in the real world, which is pretty cool if you can get past decision fatigue.

Stage 3: Detailed Documentation and Approvals

Alright, this bit's boring. Sorry, but someone has to say it.

Permits. Council approvals. Engineering certificates. So much paperwork that you start wondering if maybe humans just shouldn't be allowed to build things because clearly we've made it way too complicated. But we need this stuff. Buildings that don't fall. Fire safety. All those things that sound obvious until you realise someone actually has to check that everyone's doing it properly.

This stage drags. There's waiting. There's more waiting. Sometimes, the council comes back asking for changes that seem random. Sometimes they make sense. Either way, you've got to deal with it before anything else can happen.

And if you're building around Canberra, ACT? Having someone who actually knows the local regulations saves you from going in circles. Every area has its own quirks, and Canberra's is no different.

Stage 4: Pre-Construction

You're about to start building. Almost. Not quite yet.

This is all the setup work that happens before the first excavator shows up. Contracts get signed. Trades get scheduled. Materials get ordered. You're figuring out logistics like where the crane goes, where people park, and what arrives when. It's a lot of coordination. The kind that's invisible if it's done well and really obvious if it's done badly.

You'll also do a final cost check here. Because things have probably changed since you first budgeted. They always do. Hopefully not by much, but better to know now than get blindsided in three months.

Last Chance to Change Your Mind

Once construction actually starts, changing things gets expensive fast. You're not just redrawing plans anymore; you're undoing physical work. So if something's been nagging at you about the design, now's the time to speak up. Not later, when it's going to cost five times as much to fix.

Stage 5: Procurement

Someone's got to buy all the stuff. Every single thing that goes into a building has to come from somewhere. Concrete. Timber. Windows. Doorknobs. Light switches. That weird, specific tile you fell in love with—all of it.

And here's what makes this tricky... everything has different lead times. Some stuff you can pick up next week. Other things take three months to arrive. Maybe longer if they're coming from overseas or if they're custom-made.

Good procurement means your builder isn't standing around for six weeks because nobody remembered to order windows. It means materials show up when you need them, not three months early, where they're just sitting around getting damaged or stolen.

It's basically really complicated logistics. Not glamorous. Necessary.

Stage 6: Construction (Finally, The Actual Building Part)

This is what you've been waiting for. Dirt gets moved. Foundations go in. Walls start going up. The thing that was just drawings and conversations suddenly becomes real, and you can walk around inside it, even if it's just a frame at first.

Construction happens in phases because you can't do everything at once. Foundations first, obviously, because you need something to build on. Then structural stuff. Then the exterior. Then interiors. Then all the finishing touches that take way longer than you'd think.

Some days you'll visit the site, and heaps will have happened. Other days, it'll look like nothing changed. Both are normal. Construction doesn't move in a straight line, even though we'd all prefer it did.

There will be surprises. The ground conditions aren't quite what the geotechnical report said. The weather doesn't cooperate. A delivery shows up damaged. This happens on every project. What matters is how your builder handles it, not whether it happens at all.

That's where experience counts. At Virk Construction Management, we've done enough projects around Canberra to know that surprises are part of the process. The question isn't if something unexpected will pop up. It's how quickly we can sort it out and keep moving.

What Actually Takes Time (And Why You Can't Rush It)

Concrete needs time to cure properly. Paint needs to dry. Inspections have to happen at specific stages, and inspectors are real people with real schedules who are usually pretty booked up. You can't shortcut certain things, no matter how much you want to move in already. Trust me, trying just creates bigger problems down the track.

Stage 7: Post-Construction

Building's done. But you're not quite finished.

Final inspections happen. You get your occupancy certificate. Any little issues that showed up get fixed. You get handed over a pile of documentation... warranties, manuals, as-built drawings that show what actually got built versus what was planned.

This is when you do a final walkthrough with your builder. You're looking for anything that's not quite right. Paint touchups. A door that doesn't close smoothly. Whatever. Good builders will sort these out without making a big deal about it because they want you to actually be happy with what you've paid for.

And then? Then you get to use the space. Move in. Start operating. Whatever the point of building was in the first place.

The Bit Nobody Mentions Upfront

No construction project goes exactly to plan. Not one. I've never seen it happen, and I've been doing this a while now.

But that doesn't mean projects are disasters. It just means they're real things happening in the real world with weather and people and materials and all the chaos that comes with that.

What makes the difference between a project that's stressful and one that's manageable usually comes down to communication. If everyone knows what's happening and why, surprises don't feel quite so bad. You're not left wondering what's going on or why something changed. You just... know.

Building something is a big deal. Doesn't matter if it's your home, a commercial space, or something else entirely. It takes time. It takes patience. It takes a lot of people coordinating a lot of moving pieces. But knowing what's coming makes it feel less overwhelming.

And honestly? That's half the battle. Just knowing what to expect so you're not constantly wondering if things are going wrong or if this is just how it goes. Usually it's the latter. Usually everything's fine, just slower than you hoped. Which is pretty much construction in a nutshell.

If you're looking at construction services in Canberra, find people who'll actually explain what's happening instead of just throwing jargon at you. Someone who gets that you probably haven't done this before, and that's okay. That's what matters when you're about to spend months and a lot of money building something you'll hopefully love for years.

Previous
Previous

What Are the Setbacks for Building in Canberra?

Next
Next

Construction Project Development Canberra ACT: Local Regulations, Costs & Process Explained